top of page

E P I C.  Do More.

DBEs and Certified Small Businesses

Searching for your next project to bid? Looking to partner with another DBE firm?  Trying to connect with a GC or Agency?  The EPIC Search Tool will make it easy for you!   EPIC is simple to use: 

 

     1. Select STATE

     2. Select ONE category to SEARCH BY

     3. Press ENTER and see your results!

Ready to be EPIC?

arrow&v
Search
Project Title
Agency
Logo pic
Responses Due
Scope of Work
Contact - First Name
Contact - Last Name
Contact - Email
Installation of the Chargepoint Fleet Charging Stations at Multiple locations
Metropolitan Council
9/13/2019 4:00:00 PM CST
MCES shall furnish the charging station and cellular gateway. The contractor is required to obtain and provide all required permits, labor, equipment, materials needed to complete the installation of the Chargepoint Fleet Charging Stations. However, is not limited to, installation of proper new circuit breakers capable of handling up to 40 amps, conduit, wiring, panel, control enclosure, charging station, feeders and secured mounting. The Electrical Vehicle charging station shall be the CPF25-L18-CMK6 Chargepoint Fleet Charging Station with one CPGW1 Gateway per location, 18-foot cable, 208/240, 40A, L2 charger with a wall-mount option, access control, and a 6-foot cable management kit.
John
Phu
john.phu@metc.state.mn.us
Installation of the Chargepoint Fleet Charging Stations at Multiple locations
Metropolitan Council
9/13/2019 4:00:00 PM CST
MCES shall furnish the charging station and cellular gateway. The contractor is required to obtain and provide all required permits, labor, equipment, materials needed to complete the installation of the Chargepoint Fleet Charging Stations. However, is not limited to, installation of proper new circuit breakers capable of handling up to 40 amps, conduit, wiring, panel, control enclosure, charging station, feeders and secured mounting. The Electrical Vehicle charging station shall be the CPF25-L18-CMK6 Chargepoint Fleet Charging Station with one CPGW1 Gateway per location, 18-foot cable, 208/240, 40A, L2 charger with a wall-mount option, access control, and a 6-foot cable management kit.
John
Phu
john.phu@metc.state.mn.us
Installation of the Chargepoint Fleet Charging Stations at Multiple locations
Metropolitan Council
9/13/2019 4:00:00 PM CST
MCES shall furnish the charging station and cellular gateway. The contractor is required to obtain and provide all required permits, labor, equipment, materials needed to complete the installation of the Chargepoint Fleet Charging Stations. However, is not limited to, installation of proper new circuit breakers capable of handling up to 40 amps, conduit, wiring, panel, control enclosure, charging station, feeders and secured mounting. The Electrical Vehicle charging station shall be the CPF25-L18-CMK6 Chargepoint Fleet Charging Station with one CPGW1 Gateway per location, 18-foot cable, 208/240, 40A, L2 charger with a wall-mount option, access control, and a 6-foot cable management kit.
John
Phu
john.phu@metc.state.mn.us
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Fire Alarm System Transition Terminal 1-Lindergh at Minneapolis-St. Paul International Aiport
Metropolitan Airports Commission
null
null
null
null
null
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Weeding the at Hennepin-Lyndale Commons
State of Minnesota
10-4-19 11:00 AM
The project scope includes but not limited to: weeding and a one-time application of an approved pre-emergent herbicide. The project occurs exclusively within the median area located between Hennepin Avenue and Lyndale Avenue in Minneapolis from Summit Avenue to Douglas Avenue. See the aerial map below for reference. The project length is approximately 440 ft. or roughly 0.08 mile.
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Lawn Mowing of the Maryland Avenue Area at Interstate 94
State of Minnesota
08-21-2019 12:00 PM
This project is for the removal of litter, tree trimming & removal, and the mowing in Maryland truck station area within MnDOT R/W. The project areas will be small stripe areas or lots near our highway system or along the frontage roads within MN DOT Property Right-of-Way areas: I-94 from 280 to White Bear both directions
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Landscape Establishment of Wheelock Parkway to Little Canada Road at Interstate 35E
State of Minnesota
7-29-19 2:00 AM
This work shall consist of watering, weeding, mowing, selective pruning of woody plant material, and scouting and reporting of establishment activities and project area conditions. The project occurs in Ramsey County from Wheelock Parkway to Little Canada Road in Little Canada/Maplewood/St. Paul. The project length is approximately 11,117ft. or roughly 2.1 miles. All trees and shrubs were planted in 2018 and 2019 under SP 6280-397 and a portion of SP 6280-382 (attached for reference). Trees and shrubs were not planted in the exact locations and quantities as shown on the SP 6280-382/397 plan. Bidders are expected to visit the site for a field review and to make their own quantity determinations.
Rachel
Guan
Rachel.guan@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us
Construction of Cedar Hill Campground at Whitewater State Park
State of Minnesota
10-03-2019 05:00 PM CST
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It shall not be construed as a detailed list of work included in the contract.      1. Site work including demolition, clearing, excavation, erosion control, bituminous and concrete pavement, water distribution system, septic system, electrical system, site preparation, and landscaping.      2. Building work including construction of a shower building, four vault toilets, and well house improvements.      3. Coordination of main electrical power installation with the Electrical Company.
Duane
Kroll
Duane.Kroll@state.mn.us

​

bottom of page